Landslide Detection

Susceptibility map vs. landslide inventory: what's the difference?

Dark storm clouds gathering over a forested mountain ridge and valley.

A susceptibility map lands in the inbox every so often, usually recompiled from the same static layers: slope angle, lithology, land cover, maybe a soil moisture index someone kriged five years ago. It's useful for long-range planning. It tells you almost nothing about what moved last Tuesday, when 180 mm fell over the upper catchment in six hours.

That gap, between a long-run probability model and a field record of what failed, is the one most field teams hit when a director asks for "the landslide data" the week after a storm or a shake.

Susceptibility zonation is a static probability layer

A susceptibility map answers one question: given a slope's intrinsic properties, how likely is it to fail at some point, independent of any specific storm or quake? It's built by overlaying slope angle, aspect, lithology, structural discontinuities, land cover, and sometimes a rainfall threshold curve in a GIS. The output is zonation: low, moderate, high, very high, rendered as polygons that stay fixed until someone reruns the model with updated inputs, which might be years from now.

This is where the hazard map vs. inventory map confusion usually starts. Susceptibility and hazard aren't quite the same thing either. A hazard map typically folds in a return period or a trigger magnitude; susceptibility is more often a relative ranking with no timeline attached. But both are inference. Neither one tells you a scarp exists until someone draws the polygon and runs the numbers, and the numbers don't update themselves after an event.

An inventory is a record of what moved

A landslide inventory is a census, not a forecast. Each scarp, failed flank, and debris runout lobe gets mapped as a discrete feature, tied to a date or an event window, not a probability class. It's the ground truth a susceptibility model needs for validation, and it's also the thing a regional survey team needs in hand 48 hours after heavy rain or seismic shaking: which slopes let go, where the debris ran, how far it reached.

Field crews doing regional slope stability screening after an event don't have the luxury of checking every tributary before the next storm resets the hillside. A susceptibility layer can point crews toward the zones worth a closer look, but it can't tell anyone whether the slope above the access road is still standing this week. An inventory can, because it's built from what's on the ground now, not from what the terrain model predicted in general.

The two layers feed each other in a working survey: susceptibility narrows where to look first, the inventory records what was found on the ground, and over a few events the inventory becomes the dataset that recalibrates the next susceptibility run. Skip the inventory step and the susceptibility model never actually gets better. It just keeps recycling the same static inputs.

Where the bottleneck usually sits

The theory is straightforward. The bottleneck is almost always production time. Compiling a post-event inventory by scanning archive satellite tiles valley by valley, tracing scarps and runout by eye across a whole watershed, can eat weeks a survey team doesn't have when the next frontal system is already forecast. Landslide Detection maps fresh scarps and debris runout from high-resolution satellite imagery at regional scale, so the deliverable is the inventory layer for the whole event footprint, not a single-site report pieced together tile by tile.

If the next storm or shake leaves a region needing that census fast, that's the gap this is built to close.

← Back to the blog